Zamboanga
City (February 10, 2017) – As part of peacebuilding priorities of the
Autonomous Region in Muslim Mindanao (ARMM), the regional government has
earmarked P199 million for the concreting of roads in Basilan.
Residents of Basilan who have experienced peace and order problems in the past are expecting full support from the Duterte administration in the near term as the ARMM government continues to pour in funds for high-impact projects in the province.
ARMM Governor Mujiv Hataman led the signing of an agreement for the implementation of the Basilan Transcentral Road Phase II projects on Fridaymorning, February 10, in this city. The governor noted how important infrastructure is for peace, stability and economic development in the region.
The other signatories are Brig. Gen. Arnold F. Fernandez, brigade commander of the 54thEngineering Brigade; Public Works-ARMM Secretary Don Mustapha A. Loong; Lt. Col. Arnel F. Fernandez, commanding officer of the 54thEngineering Construction Battalion of the 54thEngineering Brigade and Basilan Governor Jim S. Hataman-Saliman.
The road projects comprise the concreting of the 3.5-kilometer Sampinit-Masola Road in Isabela City with an allocated budget of P82 million, and the 5-kilometer Sampinit-Punoh-Mahadie Road in Sumisip town with an appropriation of P117 million.
Sec. Loong said the roads form part of the Basilan Transcentral Road and among the first projects being undertaken under Phase II of the Transcentral project. A total of P806.05 million was allocated for Phase II covering 34.3 kilometers.
Meanwhile, the implementation of Phase I of the Transcentral project is currently on-going with a budget of P252 million covering 21 kilometers. The allocation was sourced from the 2016 regular infrastructure budget of the region.
Secretary Loong added that the Basilan Transcentral Road project is one of the key connectivity projects of Governor Hataman in Basilan that will reduce travel time between Sumisip and Isabela City, and between Maluso and Lamitan City.
The project connects different towns located at the center of the province to the Basilan Circumferential Road. “This will allow better logistics and people interconnectivity in Basilan,” Sec. Loong said.
“It is hoped that upon completion of the Basilan Transcentral Road, there will be peace in Basilan, faster movement of people, cheaper transport costs, more agricultural areas developed and a more competitive Basilan ready for the Asean integration, Brunei-Indonesia-Malaysia-Philippines East Asean Growth Area and the Basilan Economic Zone,” Sec. Loong added.
Since 2012, ARMM has allocated a total of P7.865 billion for infrastructure projects in the province. For this year, a total of P2.207 billion has been earmarked under the region’s infrastructure program. (Bureau of Public Information)
(By
JC-MPF with PR from Bureau of Public Information – ARMM)
No comments:
Post a Comment